¿Planea en torno al Año Nuevo Chino? Reserve espacio con anticipación: las fábricas y los transportistas se ralentizan por varias semanas.

PacBridge Freight

Cargo Inspection and Quality Control Coordination

We coordinate independent third-party inspections at the factory or origin warehouse, timed to the shipment, so defects are found before goods are paid for and loaded. Here is how inspection types and sampling work.

Esta página aún no está disponible en su idioma. Está viendo la versión en inglés.

Why inspect before shipment

Once goods are on the water, fixing a defect means returns, rework in the U.S. or write-offs. An inspection before shipment gives you evidence to request rework, replacement or a price adjustment while the supplier is still waiting for balance payment. We coordinate inspections with independent third-party QC providers and align the inspection date with the booking, so the result arrives before the cargo cutoff rather than after.

The inspector's findings are reported to you; you decide whether to release payment and shipment.

Inspection types

InspectionWhenWhat it coversBest for
Factory auditBefore placing the orderCapability, capacity, quality system, basic complianceNew suppliers
Initial production checkAt start of productionRaw materials, components, first-off samplesCustom or complex products
During-production inspectionAbout 20–60% completeEarly defects, process issuesLarge orders or long lead times
Pre-shipment inspection (PSI)Production complete and at least 80% packedRandom sample of finished, packed goodsMost orders
Container loading supervisionDuring loadingCount, condition, loading method, seal numberHigh-value or mixed-supplier FCL

How sampling works (AQL)

Pre-shipment inspections usually draw a random sample using the acceptance sampling tables in ISO 2859-1 (equivalent to ANSI/ASQ Z1.4). You choose the inspection level and the acceptable quality limit (AQL) for each defect class:

  • Critical defects: unsafe or noncompliant; usually zero tolerance.
  • Major defects: likely to cause returns or prevent use; a common AQL is 2.5.
  • Minor defects: cosmetic issues unlikely to cause returns; a common AQL is 4.0.

The sample size depends on the lot size and inspection level. The inspector counts defects in each class and compares them with the accept/reject numbers for that sample. A "fail" or "pending" result is information for your decision, not an automatic rejection.

What a pre-shipment inspection checks

  • Quantity produced and packed vs. the purchase order
  • Product appearance and workmanship against the approved sample
  • Dimensions, weight, color and material against your specification
  • Functional tests (power on, assembly, fit, zippers, seams)
  • On-site tests you specify, such as carton drop test or barcode scan
  • Packaging, inserts, warnings and instructions
  • Shipping marks, carton labels and FBA or retailer labels
  • Country of origin marking on product and packaging
  • Carton dimensions and gross weight for freight data

A clear inspection checklist written by you, with photos of the approved sample and a defect list, produces far more useful reports than a generic inspection.

Regulatory testing is separate

A visual inspection does not prove compliance with U.S. regulations. Children's products need a Children's Product Certificate based on testing by a CPSC-accepted laboratory, and many consumer products need a General Certificate of Conformity (CPSC guide). Food-contact items, cosmetics and medical devices fall under FDA (FDA guide). Inspectors can collect samples and send them to a laboratory you choose, but lab testing is booked and priced separately.

Timing an inspection

  1. Confirm with the supplier that production is complete and at least 80% packed.
  2. Book the inspection several working days ahead; inspector availability tightens before holidays.
  3. Schedule it so a reinspection still fits before the cargo cutoff.
  4. Hold the balance payment until you have reviewed the report.

How pricing works

Third-party inspections are generally priced per inspector-day (man-day) at the factory, plus travel for remote locations. The number of man-days depends on sample size, the number of SKUs, the depth of functional testing and whether loading supervision is included. Reinspections after a failure are charged again. Lab tests are quoted per test. Inspection costs can be added to a shipment estimate; start with the quote tool and describe the inspection scope, or contact us for multi-factory programs.

What can go wrong

  • The supplier says goods are ready but only part of the order is packed, so the inspection is rescheduled.
  • The inspection is booked without your specification, so the report misses the defects you care about.
  • Goods pass inspection but the shipping marks or labels are wrong; include packaging checks.
  • A failed result arrives the day before the cutoff with no time for rework.

Preguntas frecuentes

Do you perform inspections yourselves?

We coordinate inspections with independent third-party quality control providers and align them with your shipping schedule. The inspector's report goes to you for the release decision.

What AQL should I use?

Many importers use zero tolerance for critical defects, 2.5 for major and 4.0 for minor, then tighten levels for high-risk or premium products. Your product's return risk should guide the choice.

Does a passed inspection mean my product is compliant?

No. Inspection checks quality against your specification; regulatory compliance such as CPSC or FDA requirements depends on proper testing, certificates and labeling.

Can inspection happen at the origin warehouse instead of the factory?

Yes, which is convenient when goods from several suppliers are consolidated. However, defects found there are harder to rework than at the factory.

What is container loading supervision?

An inspector attends loading to verify counts, carton condition, loading method and the seal number. It is useful for high-value cargo and mixed-supplier containers.

¿Tiene un envío complejo?

Varios proveedores, mercancías reguladas o carga de proyecto: envíenos los detalles y un especialista preparará el plan y la cotización.